Non-compliance with building codes in apartment buildings and detached houses, etc.

Why did this non-conformity occur? Why was it overlooked?

(Kanki) Currently, we are thoroughly examining the construction instructions, construction management status, training records for workers, inspection methods, etc., at the time, in order to determine the cause.

How often are these kinds of inspections carried out?

(Kanki) We conduct annual inspections of the work processes at our production subsidiary, but in previous inspections, we were unable to verify the dimensions of the actual assembly screws. This issue was discovered during an independent quality inspection at the production subsidiary.

What countermeasures are being considered for the future?

(Kanki) We are taking steps to carry out inspections and necessary corrective work. We will use this incident as a lesson to improve component design and establish effective inspection methods to prevent recurrence.

About High Performance Plastics (HPP) Company

[Document P30] How much of the 6 billion yen improvement in operating profit in the mobility sector is expected to come from Interlayer and Aerospace?

(Shimizu) We estimate the breakdown to be 4 billion yen from the automotive sector and 2 billion yen from the aircraft sector. In both cases, the selling price was improved when long-term contracts were renewed, and the effects of this will be realized throughout the fiscal year in 2023.

[Document P30] What is the impact of by-product market conditions?

(Shimizu) When our company produces PVA, acetic acid is also produced as a by-product, which we then sell back. In fiscal year 2023, we anticipate that the balance between supply and demand will be disrupted, which will have an impact on the selling price of acetic acid.

About Housing Company

Housing prices rose considerably last quarter. Are you expecting them to rise again this quarter? Also, what are the components and CR (Critical Cost) included in this quarter's budget?

(Kankichi) Housing prices have been gradually revised in response to the impact of rising material costs so far. The effects began to become noticeable in the second half of fiscal 2022, and will be reflected throughout fiscal 2023. In fiscal 2023, we expect the continued manifestation of the increase in apartment complexes and smart equipment, as well as the integration effect of Plant.

[Document P35] What are the reasons why the number of units sold fell short of expectations?

(Kanki) In fiscal year 2022, amid the prolonged COVID-19 pandemic, higher-than-expected inflation led to a significant decline in construction sentiment. This had repercussions even for first-party buyers, who had been driving the market until then, particularly affecting orders for condominiums and resulting in a decrease in the number of units sold in the second half of the year.

About Urban Infrastructure and Environmental Products (UIEP) Company

Terms of trade have remained positive throughout fiscal year 2022, and further improvements are planned for this fiscal year. Given that the business environment is not necessarily favorable, what are the underlying reasons for the continued improvement in selling prices?

(Hirai) Regarding pipe materials, significant price revisions were made in FY2022. Price revisions for other products, such as fire-resistant materials and FFUs, were carried out in the second half of FY2022, and the plan is for the effects of these to become apparent in FY2023.

others

[Document P15] human capital investment states that the fixed cost impact is 13.5 billion yen. What does this mean?

(Kato) In addition to the usual salary increases, we have increased wages and enhanced reskilling such as training. For example, as part of future DX initiatives, we are planning to increase fixed costs as part of the human capital investment including reskilling in such areas.